Komatsu — TIPS FOR LONGER UNDERCARRIAGE LIFE

. OPERATION OPERATION MEASURING LINK PITCH the link pitch. REMARK 3 - 128 INSPECTION AND REPAIR Frequent inspectio n and promp t repair will reduc e repair c osts. The follow ing items for inspecti on will serve as a g uide to m aintenance s ervice of each underca rriage part. Perform periodical inspectio n and conta n your limits and reversing 1. Insert a woode n block betw een track shoe and sprocket to take up th e slack in track shoes. Meas than ure pitch 2 links aw Basic link pitch (P) : 228.85 mm Bushing t urning lim it link pitch Heavy-du ty: 231.8 5 mm (9.1 in Standard : 233.85 m There is n o link win dow on the master link.