. MAINTENANCE SERVICE PROCEDURE EVERY 250 HOURS SERVICE of and cover (1). 4 - 43 LUBRICATIN 1. Lowe r the work e quipment to the ground, then stop the e ngine. 2. Usin g a g rease p ump, pump in grease through the greas 3. After greasing, w ipe off any o ld grease tha t wa s pushed out. Greas e equalizer bar side pin (4 places Left and right sides o f machine: 2 places e ach 1) R he top ack frame 2) C limb on top of the straig ht frame a nd remove the red plug om ( A) betw een the trac k frame a nd track shoe. 3) C arry out the greasing fro m the to p of the t rack shoe. arts to use ( supplied pa rts) Grease pu mp ass'y (0 7952-80002) Nozzle (07 951-41043) : Tube ty pe