6. EDS (Electronic Diagnosis System) 3. POWER-SHUTTLE DIAGNOSISPROGRAMM DEST 45 6. EDS (Electronic Diagnosis System) 3. POWER-SHUTTLE DIAGNOSISPROGRAMM DEST 45 3.1 PREPARATIONS FOR TRANSMISSION DIAGNOSIS WITH DEST 45 As a preparatory measure the connection between tractor and computer needs to be established so as to check the trans- mission control by means of DEST 45 resp. to be able to carry out the end-of-line programming. Fig. 23 - Interface cable and adapter cable The interface cable and the adapter cable are serving for this purpose (see figure).
1 - Connect plug (2) of the interface cable with the designation ”9141” to the computer (COM interface) 2 - Connect plug (3) of the interface cable for the 12 V supply to the cigar lighter 3 - Connect the 4-pole plug (4) of the interface cable to the plug (11) – designation ”powershift Agrotron 4.70-6.45” – of the adapter cable 4 - Insert the central plug (8) of the adapter cable into the central diagnosis interface in the fuse box 5 - Switch ON ignition 6 - Start the computer and call the EDS program (compare item A 1.3 – Launching and terminating of the EDS program) 7 - Call Option 1 in the initial menu 8 - Make sure that the right diagnosis program (DEST 345) is invoked.
On the right side in the upper frame of the screen DEST 45 needs to be displayed, and below e.g. DEST 45 – V 2.2 – 16.12.97. If necessary change to the main menu and launch DEST 45 via the menu item Control > DEST 45. CAUTION! Before starting the diagnosis verify that the proper interface (COM 1 or COM 2) is selected in the menu item Op- tions! 20-185