Doosan DX225LC-3 — Grease Boom and Arm Joint Pins

DX225LC-3 Inspection, Maintenance and Adjustment 4-40 250 HOUR / MONTHLY SERVICE Perform All Daily and 50 Hour Service Checks Grease Boom and Arm Joint Pins Grease every 10 hours for first 100 hours and every 250 hours thereafter. NOTE: If the unit has been running or working in water, the front attachment must be greased on a 10 hour/daily basis. • Position machine as shown below and lower the front attachment to the ground and stop engine. • Press the grease fitting and inject grease with the grease gun on the marked point. • After greasing, clean off the old grease that has been purged.

B, C, D E F A G FG020111 Figure 42 Reference Reference Description Description Number Number A Boom Cylinder Head Pin (2 Points) E Boom Arm Joint Pin (2 Points) B Boom Foot Pin (2 Points) F Arm Cylinder Rod Pin (1 Point) C Boom Cylinder Rod Pin (2 Points) G Bucket Cylinder Head Pin (1 Point) D Arm Cylinder Head Pin (1 Point) Reference Number Description A Boom Cylinder Head Pin (2 Points) B Boom Foot Pin (2 Points) C Boom Cylinder Rod Pin (2 Points) D Arm Cylinder Head Pin (1 Point) Reference Number Description E Boom Arm Joint Pin (2 Points) F Arm Cylinder Rod Pin (1 Point) G Bucket Cylinder Head Pin (1 Point)