DX225LC-3 Specification 7-20 Track Width : 2.99 m (9’ 10") STD Track A Boom : 5.7 m (18’ 8") Arm : 2.4 m (7’ 10") Bucket : Without Bucket Counterweight : 4,300 kg (9,480 Ib) Shoe : 800 mm (32") B Dozer : Without Dozer : Rating Over Front : Rating Over Side or 360 degree Unit : 1,000 kg (1,000 lb) FG022016 Figure 18 METRIC 1,000 kg A (m) B (m) 3 4.5 6 7.5 MAX. REACH A (m) 7.5 * 6.19 5.93 5.64 6 * 5.93 5.39 * 5.94 4.33 6.84 4.5 * 7.61 * 7.61 * 6.39 5.24 5.68 3.68 5.61 3.64 7.56 3 * 9.38 7.57 * 7.16 5.01 5.59 3.61 5.13 3.31 7.93 1.5 * 10.78 7.13 7.64 4.79 5.49 3.51 4.99 3.20 8.00 0 * 11.21 6.95 7.49 4.66 5.42 3.45 5.15 3.29 7.78 -1.5 * 10.
51 * 10.51 * 10.79 6.93 7.45 4.63 5.69 3.62 7.26 -3 * 12. 73 * 12.73 * 9.49 7.05 * 6.95 4.72 * 6.32 4.42 6.33 -4.5 * 6.35 * 6.35 * 5.70 * 5.70 4.78 FEET 1,000 Ib A (ft) B (ft) 10 15 20 25 MAX. REACH A (ft) 25 * 13.73 13.57 18.08 20 * 13.04 11.59 * 13.12 9.69 22.23 15 * 16.42 * 16.42 * 13.92 11.29 12.44 8.07 24.70 10 * 20.22 16.35 * 15.53 10.80 12.04 7.77 11.33 7.32 25.98 5 * 23.29 15.39 16.45 10.34 11.82 7.57 11.01 7.06 26.25 0 * 24.30 14.97 16.13 10.05 11.69 7.45 11.35 7.25 25.54 -5 * 24. 01 * 24.01 * 23.41 14.93 16.05 9.98 12.58 7.99 23.77 -10 * 27. 60 * 27.60 * 20.49 15.19 * 14.80 10.21 * 13.91 9.83 20.65 -15 * 13.06 * 13.06 * 12.89 * 12.89 15.11 1. Load point is the end of the arm. 2.
Capacities marked with an asterisk (*) are limited by hydraulic capacities. 3. Lift capacities shown do not exceed 75% of minimum tipping loads or 87% of hydraulic capacities. 4. The least stable position is over the side. 5. The total weight of machine is 21,600 kg (47,600 lb). Included are the; boom 5.7 m (18' 8"), arm 2.4 m (7' 10"), 4,300 kg (9,480 lb) counterweight, without bucket, all operating fluids and a 75 kg (165 lb) operator. 6. Lift capacities are in compliance with ISO 10567.