CMW XT855 — Contents

XT855 Operator’s Manual Contents - 9 p Contents Foreword part number, revision level, and publication date of this manual, and factory contact information 7 Controls machine controls, gauges, and indicators and how to use them 21 Prepare procedures for inspecting and classifying the jobsite, planning the installation path, and preparing the jobsite for work 39 Transport procedures for lifting, hauling, and towing 49 Systems and Equipment procedures for changing excavator control pattern, using SK attachments, and a list of optional equipment 67 Service service intervals and instructions for this machine including lubrication, replacement of wear items, and basic maintenance 75 CMW Overview machine serial number, information about the type of work this machine is designed to perform, basic machine components, and how to use this manual 1 Safety machine safety alerts and emergency procedures 11 Operation Overview an overview for completing a job with this machine:

planning, setting up, installing product, and restoring the jobsite; with cross references to detailed procedures 37 Drive procedures for startup, cold start, driving, and shutdown 45 Dig procedures for using excavator to dig trenches and move material 61 Complete the Job procedures for restoring the jobsite and rinsing and storing equipment 73