. OPERATION OPERATION V-SHAPE LOADING REMARK 3 - 119 Position t he dump truc he wheel loa der is approx. 60 degrees f rom the dir ection o f approach to the stoc kpile. After lo ading the bu cket, drive the whe el loader in reverse, t hen turn it to ump truck. dum forward to load the d The small er the turnin efficient th e operation b ecomes. When loa first shake ding a full bu the bucket to cket and stabilize rais the ing it load to th before e maximum raising the height, bucket.
This will p revent the loa d from spillin g to the re PRECAUTIONS WHEN PILING UP LOAD S When for ming products into a pile, b e careful n ot to let the rear counterweight come into co ntact with the groun Do not set the bucket t o the DUMP position wh en piling-up loads. As far as possible, do n ot use the tr ansmission cut-off f unction during scraping-up operatio n. This will prevent t machine f rom rolling ba