Komatsu — REMOVAL AND INSTALLATION OF THE BUCKET

. OPERATION OPERATION REMOVAL AND INSTALLATION OF THE BUCKET WARNING NOTICE 3 - 137 When pins are knocked in w ith a hammer, pieces of metal m ay fly and cause When carrying out this oper ation, always wear goggles, har d hat, gloves , and other protective equip When the bucket is remove d, place it in a stable condition. I f pins are hit with a strong f orce, there is a hazard that the pin may fly out and i njur e people in the surr ounding area. Make sure hat there is no one in the s urrounding area before starting t he operation When removing the pins, do not stand behind the bucket.

In a ddition, be extremely careful not to put y our foot under the bucket while standing at the side f When removing or inserting pins, be extremely careful not t o get your fingers Never insert your fingers in to the pin holes when aligning th e holes. Remove or install the buck et in the following manner, if s o required for t he convenience of t Thi s method of removal and in stallation is applicable to the sta ndard specification The method of removal and in stallation will differ according to the attachments and options that are in For details of the procedure fo r machines that are not the stand ard specification , please consult your REMOVING THE BUCK 1. Remove mounting bolt 2.

Sling the bucket link, th en pull out bucket link pin (2) Secure the bucket link to the bell crank with wires.