. OPERATION OPERATION (A)Length of track on ground RIPPING BY CLIFFS When carrying out ripping at the edge of a cliff, tilt the ripper back (B) to make depth (L) longer. Depress the decelerator pedal, drive slowly forward, and when the ripper point contacts the cliff, tilt the ripper in (A). 3 - 128 TRACK OF RIPPER SHA NK eration as follows, passing through the points shown in the diagram above. Carry out the ripping op eration as follows, passing thr ough th e points s hown in the diagram ab (1) Til t the ripper back, lower the rippe r poin t to t he gr ound th at the plac e to begin ripping, and r aise the rear of the machine.
(2) To press the deceler ator pedal and lowe r the engin e speed , set the s peed range to F1, and tilt the ripper to insert the point to the spec ified depth. nt reaches the specified depth, raise the engine speed to full speed and travel forward. arry out ripping. ed even when the shank is tilted, change the shank mounting hole to the hole below and epth. ripping, travel forward, raise the shank from the bed rock, then travel in reverse.
(3) When the ripper poi nt reaches the specified depth , raise t he engine speed to full speed and Til t the shank and c arry out ripping If t he circuit is reliev ed even when reduc e the ripping d (4) After c ompleting the ripping, travel forward, r aise t he shan k from th e bed rock, then travel in (5) While traveling in reverse, tilt the ripper back, and when the starting point for the ripping is reached, lower the verse, tilt the r ipper back , and when t he startin reached, lower the ripper. REMARK If t he r ipper is applie d with the rear of th e machine raised from the ground, the draw bar pull will be low, s o the rippi ng efficiency will be reduced.
th is kept constant, there will be no s will increase the efficiency of the dozing If the ripping dep unevenness, and thi operation. nsta the e fficiency o f the do zing