. OPERATION OPERATION ADJUSTING RIPPER then knock it in with a hammer. 3 - 134 ADJUSTING DIGGING DEPTH The re are mounting holes in the shank to chose to match t he ripping depth. Normally, use the bottom hole, b particularly deep ripping is ne W hen a giant ripper is inst or details, see "METHOD OF OPERATING PIN PULLE R (PAGE 3-126)". (Machines equipped with mu Place a pointed object o hammer to remove from Remove pin (2) and chan ge the position of the shank h Insert pin (1) partially by hand then knock it in with a ha mmer. The pin is made of on REPLACING POINT AND PRO TECTOR rotector and point installed to the tip To p rotect the shank, if the p worn, replace them.
are Plac e a pin remover on the p in marked by the arrow, then h it with a ha mmer to remove from th e opposite side. REMARK The pin is a unitized type, so insert the pin partially by hand , then kno ck it in fully with a hamm er.