. ATTACHMENTS, OPTIONS EFFECTIVE METHOD OF OPERATION FOR DUAL TILT DOZER DOZING WORK DOZING ON LEVEL GROUND, OR DOWNHILL NATURAL GROUND, BEDROCK WARNING (2) and continue digging (A). FILLING, SOFT SOIL Carry out digging in R pitch or S pitch, and haul in R pitch. REMARK 6 - 8 If you feel that the situation is danger ous when dumping the soil, for safety reasons, use two movements to push the soil ove edge. 1. Dig with the FORWARD PITC H (1), and when the load on the blade is approx 8 0%, return to STRAIGHT PI 2. Set to REAR PITCH (3) whic h gives a larger load, and h aul the e most effective angle for ro lling the 3.
Use FORWARD PITCH (1) t If into the soil, and the operation ca n be carried out smoothly.