. INDEX INDEX 70 8 5 FOREWORD 2 5 7 50 FUSIBLE LINK 53 9 5 9 2 2 2 3 2 2 22 22 5 53 54 49 INSTALLATION OF CAB INTRODUCTION 12 11 12 POSITION 8 7 - 1 ACCUMULATOR , HANDL ADJUSTING POSTURE O F WORK EQUIPMEN AIR CONDITIONER, HAN DLING ASHTRAY ENGINE SERIA L NO. PLATE AN POSITION OF COMPONENTS EXPLANATION OF COMPONENT 3 - 1 - 3 - 3 - 132 3 - 64 3 - 54 1 - 3 - FRONT PANEL FRONT/REAR, LEFT/RIGHT DIRECTIONS O FUSE BLADE SERIAL N O.
PLA TE POSITION 1 - 1 - 3 - 3 - CAP WITH LOCK , HANDL METHOD OF O PENING AND CLOSING CAP WITH L CAR STEREO, H ANDLIN CHECK AFTER F INISHIN G WORK CHECK AFTER S TOPPIN G ENGINE CHECK BEFORE STARTI NG ENGINE, ADJUS COLD WEATHER OPERATION AFTER C OLD WEATH AFTER C OMPLETION OF WORK PRECAUTION S FOR L TEMPERATUR CONTROL LEVERS, PED 6 - GENERAL PRE CAUTIONS GENERAL PRE CAUTIONS PRECAUTIO NS RELATED SAFETY W W OF CONTROLS AND GENERAL VIE GENERAL VIE W OF CONTROLS AND GAUGES W OF MACHINE INTENANCE GENERAL VIE GUIDES TO MA INTENANCE 6 - 5 56 5 3 - 56 3 - 116 3 - 100 2 - 6 - 6 - 3 - 3 - 71 3 - 141 3 - 142 3 - 142 3 - 3 - 4 - 3 - 141 3 - 40 HANDLING MA CHINES EQUIPPE WITH KOMTRA BASIC PREC HANDLING OIL , FUEL, COOLAN T, AND PERFORMING OIL CLINIC 6 - 6 - DOOR OPE DOOR POCKET R DUST I NDICATO 3 - 3 - 3 - 4 - EFFECTIVE METHOD OF OPERATION FOR DUAL TILT BLADE C BOULDE R RAISING O PERATION DITCHIN G OPERATIO DOZING WOR HORIZONTAL DOZING OPERATIONS FROM S IDE SLOPE (ROUGH GROUND) LEVELIN G (SPREADIN OPERATION SIDE-CUTTIN G OPERATIONS EFFECTIVE USE OF MO SELECTION SYSTEM 3 - 140 1 - 7 6 - 6 - 6 - 6 - 6 - 6 6 11 11 8 LOADING, UNL LOCKING TORAGE RAGE ORAGE RAGE ACHINE AFTER STORAGE LONG-TERM S AFTER STO BEFORE ST DURING STO STARTING M LONG-TERM STORAGE 3 - 137 3 - 116 3 - 143 3 - 143 3 - 143 3 - 143 6 - 6 - 6 - 3 - 143 MACHINE SER IAL NO.
PLATE A 3 - 119 1 -