Komatsu — AFTER STARTING ENGINE

. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS 1) Turn fuel control dial (2) to the full speed (MAX) position and hold it for 3 seconds.

3 - 98 Turn fuel control dial (2) to a point midway be tween low idling (MIN) and full speed (MAX), run the engine at a mid-range speed, and run unde ter temperature monitor (1) displays g If th e engine water tempe rature monitor displays green, the engin e warm-up operation i Aft er checking that the en gine water temperature monito r displays g reen, carry out the wa rming-up operation fo r the hydraulic NOTICE Canceling automatic warm-u If it becomes necessary in a n emergency to cance l the a utomatic warm-up operation or to lower th e engine speed to low id le, do as f ollows When fuel contro l dial (2) is returned to th e low idle (MIN) position, the engi ne speed will drop.