. OPERATION TRANSPORTATION OPERATION TRANSPORTATION When the swing lock switch is turned ON, display monitor (9) lights up. 3 - 139 6. If t he machine is equip ped with work equipment, s et the work equipment at the front, and travel forward to load it ; if it has no work equipment, travel Follow instructions an when traveling in revers 7. Before moving onto the ramps, make sure that the machine is positioned in a straig ht line with the ramps a he centerline of the machi ne matches that of the trail Align the direction of tra vel with the ramps and tra vel slowly Lower the work equipm ent as far as possible with out causing interference. When on the ramps, operate any other lever 8.
When loading or unload ing a machine with the work equipment installed, at the point w here the tracks are on both the ramps and the ground surface , turn the swing lock switch OFF, then swing the upper structu re slowly 180°. After doing that, drive s lowly in reverse and load t he machine onto the trailer. 9. Turn the swing lock swi tch ON to apply the swing