. MAINTENANCE MAINTENANCE PROCEDURE MAINTENANCE MAINTENANCE PROCEDURE 9. Secure bracket (4) with bolt (3). 4 - 63 7. Remove undercove r (9) and blow the mud, dirt, and leaves that have been cleaned off t o the outside 8. Push in cleaned net (2) back to the original it with screw (1). place and secure