. OPERATION TRANSPORTATION PROCEDURE FOR INCREASING OR REDUCING TRACK FRAME GAUGE WARNING mounting bolts (1) (front and rear: 9 install 8 of frame on the 3 - 189 Never us e the m achine for op erations wi th the track fr ame retracted Never o perate t he cylinders s uddenly w hen extending or retracting the track frame gauge width. I t is dangerous if they are operated sudde Stop the machi ne on firm leve l ground w hen extendin g or retracting the Reducing Track Gauge 1. 1. Remo ve ce nter f each) on on e side. 2.
Swing the u pper structur e to the s ide where t he trac k frame gauge is to b e reduced, se t it at 90° to track fram e (2), t hen u se the wo rk equipmen t to jac k up the t rack frame. 3. Set bl ocks (3 ) (20 to 30 cm (8 to 12 i n) wooden b locks) t owards the ou tside of track fram e (2), then use the boom cylinder to ck frame (2) will slide and om cylinder to lower the m achine slowl y. The tra nd stop w hen it contacts the stopper. 4. Lower the machin e slow ly to the ground, th remov Tig ed mounting bolts ( htening torque: 152 front and 0 - 1910 5 - 195 kg 5. Follow other