. MAINTENANCE MAINTENANCE PROCEDURE EVERY 50 HOURS MAINTENANCE LUBRICATING 4 - 48 NOTICE I f any ab normal noise is ge nerated from any g reasing poin t, carr y out g reasing regardless of t C arry ou t greasing every 1 0 hours for th e first 50 hours on a new machine. A fter the machine was sub jected to jobs in the water, be su re to grease the wet 1. ostur right, lower the work equipm ent to the ground, then stop t he engine. 2. Using a grease pump reas fitting s shown by arrow 3. After greasing, wipe of f any old grease t hat was pu shed (1) Arm-L ink coupling pin ( (2) Arm - Bucket connecti (3) Link c oupling pin (2 pla (4) Bucke t cylinder rod pin (5) Bucket-Link coupling p