. MAINTENANCE MAINTENANCE PROCEDURE LUBRICATING NOTICE (3) Blade foot pin (2 places) 4 - 60 EVERY 500 HOURS MAINTENANC Maintenan ce for every 50, 100 and 250 hours service should be c arried o ut at the same t I f any ab normal noise is ge nerated from any g reasing point, carry out g reasing regardless of the Carry ou t greasing every 10 hours for the first 50 hours o n a new machine. After the machine was subj ected to jobs in th e water, be sure to g rease the wet pins. Prepare a grease gun greasing posture shown on the right rk equipment to the ground, then stop , pump in grease through the grease s. any old grease that was pushed out. 1. 2. 3. 1.
Set th e machine to the diagra m, lower the wo gine. a grease pump the en 2. Using fittings shown by arrow 3. After g reasing, wipe off any old grease tha t was p ushed shown on the right the hen stop (Only machines with blade (1) Blade cylinder foot pin ( (2) Blade cylinder rod end (4) Boom f oot pin (2 places (5) Boom cylinder foot pin (