COMPONENT OPERATION / Pump Device Control by Pilot Pressure from Torque Control Solenoid Valve Decreasing Flow Rate 1. When the torque control solenoid valve is activated by the signals from the main controller (MC), torque control pressure Pps increases. 2. Torque control pressure Pps and either pump 1 delivery pressure Pd1 or pump 2 delivery pressure Pd2 are combined and applied to load piston 1 (5). 3. Load piston 1 (5) pushes load piston 2 (6), spool B (7) and inner spring (9) and outer spring (10). Spool B (7) moves toward direction of the arrow. 4. Due to the movement of spool B (7), pilot pressure is routed into the large chamber of servo piston (11). 5.
Due to the difference in diameter between the large and small chambers, servo piston (11) is moved toward direction of the arrow. Therefore, the cylinder block is rotated in the minimum inclination direction and the pump delivery flow rate decreases. 6. The movement of cylinder block is transmitted to sleeve B (8) via link (13). Sleeve B (8) is moved in the same direction as spool B (7). 7. When sleeve B (8) is moved by the same stroke as spool B (7), the open part between sleeve B (8) and spool B (7) is closed and pilot pressure to the large chamber of servo piston (11) is blocked. Therefore, servo piston (11) is stopped and the flow rate decreasing operation is completed.
Flow Rate (Q) Pressure (P) 0 Dr Bleeding T1V1-03-01-005 5 - Load Piston 1 10 - Outer Spring 6 - Load Piston 2 11 - Servo Piston 7 - Spool B 13 - Link 8 - Sleeve B 9 - Inner Spring Pd1 -Pump 1 Delivery Pressure Pi - Pump Control Pressure Increase Decrease Cylinder Block Inclination Pd2 - Pump 2 Delivery Pressure Pps -Torque Control Pressure Dr - Returning to Hydraulic Oil Tank Pg - Primary Pilot Pressure (From Pilot Pump) T3-1-18 5 Pi Ai Pd1 Bl Ci Pps Dr Pd2 Dr 9, 10 6 8 7 Pg 11 13 T1V Dr 9, 6 8 7 Pg Pi Ai Bl Ci Dr 9, 10 6