hitachi — Hose Rupture Valve

COMPONENT OPERATION / Others (Upperstructure) During Boom Lowering Operation (Control Lever Stroke: More than Half-Stroke) 1. When the boom lower control lever is more than half-stroke, piston (3) pushes spool (2) to the position where passage (4) is connected to the hole on spool (2). 2. Therefore, pressure oil in the spring (5) chamber flows to passage B through spool (2) from the hole on spool (2). 3. Pressure in passage C (9) flows to passage B (8) through orifice (11). 4. At this time, a pressure difference between port B and the spring (5) chamber appears due to orifice (7) and poppet (6) moves upward. 5.

Consequently, return oil from port B flows to the spool in control valve through poppet (6) from port A and lowers the boom. 6. As pressure oil in port B flows to port A directly, oil flow rate through the spool in control valve increases and boom lowering speed becomes fast. 5 9 4 7 6 Port B Port A 2 8 10 3 T1V1-03-07-020 2 - Spool 7 - Orifice 3 - Piston 8 - Passage B 4 - Passage A 9 - Passage C 5 - Spring 10 - Spring 6 - Poppet To Spool in Control Valve T3-7-10 Press Pi ure