SYSTEM / Controller Valve Control Power Digging Control While the power digging switch is turned ON, MC drives solenoid valve unit (SG) and increases relief pressure of the main relief valve in control valve. Auto-Power Lift Control When operating boom raise with pump 1 delivery pressure in high, MC drives solenoid valve unit (SG) according to the signals from pressure sensor (boom raise) and pimp 1 delivery pressure sensor and increases relief pressure of the main relief valve in control valve. Arm Regenerative Control Condition: Pump 1, 2 Delivery Pressure:
Either Low Combined Operation of Swing or Boom Raise and Arm Roll-In On conditions above, MC drives solenoid valve unit (SC) according to the signals from pump 1, 2 delivery pressure sensors and pressure sensors (swing, arm roll-in and boom raise), outputs pilot pressure, and shifts the arm regenerative valve and the arm flow rate control valve. The arm regenerative valve closed the return circuit to hydraulic oil tank from arm cylinder rod side and supplies pressure oil to the arm cylinder bottom side. Consequently, speed of arm roll-in increases and hesitation during arm roll-in operation is prevented.
The arm flow rate control valve controls pressure oil to the arm 2 parallel circuit, supplies pressure oil to the boom 1 spool, and keeps boom raise speed. (Refer to the Control System group in SYSTEM.) Digging Regenerative Control When operating digging with pump 1, 2 delivery pressure in high, MC drives solenoid valve unit (SF) according to the signals from pumps 1, 2 delivery pressure sensors and pressure sensor (arm roll-in, boom raise), outputs pilot pressure, and shifts the digging regenerative valve. As pressure oil from pumps 1, 2 and the boom cylinder rod side flows to the arm cylinder bottom side through the digging regenerative valve, speed of arm roll-in increases.
(Refer to the Control System group in SYSTEM.) T2-1-10