SYSTEM / Controller Pump 2 Flow Rate Adjustment (Only machines equipped with optional parts) When using the attachments, fine adjust flow rate of pump 2 by keys 1 and 2 operation. The signals from the monitoring unit are sent to MC by using CAN bus line. When breaker 1 or 2 is used, MC adjusts flow rate of pump 2 while controlling maximum pump 2 flow rate limit control solenoid valve. When pulverizer 1 or crusher 1 is used, MC adjusts flow rate of pressure oil that flows from pump 2 to pulverizer or crusher while controlling the auxiliary flow rate control solenoid valve. (Refer to "Control Systems.") key 1 key 2 NOTE:
When the 2-speed selector circuit is OFF, flow rate of pump 2 can be adjusted while controlling the maximum pump 2 flow rate limit control solenoid valve. When the 2-speed selector circuit is ON, flow rate of pressure oil that flows from pump 2 to the attachments can be adjusted while controlling the auxiliary flow rate control solenoid valve. The table blow is the setting of various factors at the time of shipment from the factory. T1V5-05-01-111 When using Breaker 1 key 1 T1V5-05-01-024 key When using Pulverizer 1 NOTE: The items on monitor unit and HITACHI pattern are same.
T2-1-34 2 Type of Attachments 2-Speed Selector Circuit Valve Selector Circuit Accumulator Circuit Secondary Hydraulic Relief Selector Circuit Pump 2 Flow Rate Control Auxiliary Flow Rate Control Breaker 1 OFF to Hydraulic Oil Tank OFF ON ON OFF Breaker 2 OFF to Hydraulic Oil Tank OFF OFF ON OFF Pulverizer 1 ON to Control Valve OFF OFF OFF ON Crusher 1 ON to Control Valve OFF OFF OFF ON Monitor Unit HITACHI pattern Breaker1 Hydraulic Breaker1 Breaker2 Hydraulic Breaker2 Pulverizer1 Secondary Crusher1 Crusher1 Primary Crusher1