10 Structure, function and maintenance standard UEN00160-00 Unit: mm PC210, 230, 240-8 59 No.
Check item Criteria Remedy 1 Clearance between pis- ton rod and bushing Cylinder Standard size Tolerance Standard clearance Clearance limit Replace bushing Shaft Hole Boom 95 –0.036 –0.090 +0.222 +0.047 0.083 – 0.312 0.437 Arm 100 –0.036 –0.090 +0.257 +0.047 0.083 – 0.347 0.447 Bucket (2.0/2.5M Arm) 100 –0.036 –0.090 +0.257 +0.048 0.084 – 0.347 0.447 Bucket (3.0/3.5M Arm) 90 –0.036 –0.090 +0.257 +0.048 0.084 – 0.347 0.447 2 Clearance between pis- ton rod support shaft and bushing Boom 80 –0.030 –0.060 +0.190 +0.070 0.100 – 0.250 1.0 Replace pin or bushing Arm 80 –0.030 –0.076 +0.190 +0.070 0.100 – 0.266 1.0 Bucket (2.0/2.5M Arm) 80 –0.030 –0.076 +0.457 +0.370 0.400 – 0.533 1.0 Bucket (3.0/3.5M Arm) 80 –0.030 –0.076 +0.457 +0.370 0.400 – 0.533 1.0 3 Clearance between cyl- inder bottom support shaft and bushing Boom 80 –0.030 –0.060 +0.190 +0.070 0.075 – 0.225 1.0 Arm 80 –0.030 –0.076 +0.190 +0.070 0.100 – 0.266 1.0 Bucket (2.0/2.5M Arm) 80 –0.030 –0.076 +0.190 +0.070 0.075 – 0.225 1.0 Bucket (3.0/3.5M Arm) 80 –0.030 –0.076 +0.190 +0.070 0.075 – 0.225 1.0