Komatsu PC210-8, PC210LC-8, PC210NLC-8, PC230NHD-8, PC240LC-8, PC240NLC-8 — Removal and installation of engine and hydraulic pump assemblies

50 Disassembly and assembly UEN00660-00 PC240-8 41. Disconnect engine controller ground T12 (43). 42. Disconnect bracket (44) and remove spacer (45). 43. Disconnect clamp (46). 50. Disconnect six hoses. q (53): Rear load pressure input port hose (Color band: No color) q (54), (55):EPC basic pressure port hose (Color band: No color) 44. Disconnect terminal (46) from the starter ST. 45. Disconnect connector E10 (47). a Connector at the starting motor side:T13 46. Disconnect connectors E08 (48) and P44 (49). 47. Disconnect clamp (50). q (56): Pump pressure input port hose (Color band: blue) q (57): Front load pressure input port hose (Color band: red) q (58): Drain port hose 51.

Disconnect bracket (59). 52. Turn elbow (60) downward. a To be not obstructive in removing the engine. PC210/230-8 48. Disconnect clamp (51). (PC240-8 only) 49. Remove filter and bracket assembly (52). a Put it on hose bracket (HB). PC210/230-8 PC240-8 PC210, 230, 240-8 41 54 55 58 56 59 57 53 60 5 2 HB