Hitachi Construction Machinery — SERVICE MANUAL REVISION REQUEST FORM

1B-6 Mechanical (6HK1) 1. Water rubber hose 1. EGR cooler C 2. EGR bracket C 3. EGR cooler B 4. EGR cooler bracket A 2. Remove the EGR pipe B from the EGR valve and the EGR cooler C. 7. Remove the EGR heat protector from the EGR pipe A. 1. EGR valve 2. EGR pipe B 3. EGR cooler C 1. EGR heat protector 3. Remove the EGR cooler C from the EGR bracket C. 8. Remove the EGR cooler A from the EGR pipe A. 4. Remove the EGR bracket C from the EGR cooler B. 9. Remove the EGR pipe A from the exhaust manifold. 5. Remove the EGR cooler B from the EGR cooler bracket A. 6. Remove the EGR cooler bracket A from the EGR cooler A.