OPERATION 3.7 ELECTRICAL EQUIPMENT IN CAB BASE Components of Electrical Preheating System in Cab Base (continued) Be sure to switch off main switch (2), illust. Z26304 and to shut down the generator set or to disconnect the power sup- ply cable from external power source before working on any part of the heating system. Operating the Preheating System Use the preheating system during stand-still periods e.g. over night and low ambient temperatures. The heating system should be energized as soon as the engines are shut down. This allows the heating system to maintain the desired temperature with the use of minimum power.
The preheating systems for hydraulic oil and engine coolant are equipped with additional control boxes with separate ON/OFF switches. See following pages for more information. Battery Charger (3) Power supply to the battery charger is provided by the generator set or an external power source connected to the 1X2 plug socket at the cab stairway. The batteries of the shovel are charged by the battery charger (3). The battery charger is switched ON and OFF with the switch on the front panel of the battery charger. For oper- ating instructions refer to the separate Users Manual "MASTER- VOLT" battery charger filed in volume 2 binder. 225 WARNING WARNING