Komatsu — 4.12.1 HIGH STRENGTH BOLT CONNECTIONS - CHECK TORQUE LOAD

MAINTENANCE 4.12 EVERY 1000 OPERATING HOURS OR EVERY 6 MONTH High-Strength Bolt Connections (continued) Check condition and fastening of all emergency escape lad- ders, see illustration Z25294. Legend for illust. Z25294 (A) Emergency escape ladder on Operator’s cab plat- form, see also page 52 for more information. (B) Emergency escape ladder on superstructure plat- form, see also page 54 for more information. (C) Emergency escape ladder on upper deck, see also page 487 for more information. (D) Emergency escape ladder with escape hatch on counterweight, see view -E- for details. (E) Counterweight with emergency escape ladder viewed from inside machinery house.

(1) Emergency escape ladder on counterweight (2) Fastener for escape hatch (3) (3) Escape hatch (4) Openings in the counterweight. In case of a fire in the machinery house, these openings can be used for pouring fire extinguishing agent into the machin- ery house. Make sure all emergency escape ladders are in place and in good condition. Replace defective parts without delay. 411