Komatsu — 4.12.1 HIGH STRENGTH BOLT CONNECTIONS - CHECK TORQUE LOAD

MAINTENANCE 4.12 EVERY 1000 OPERATING HOURS OR EVERY 6 MONTH High-Strength Bolt Connections (continued) Check fastening and condition of control valve carrier, main control valves (I, II, III and IV) and, if so equipped, on swing control valve (V), illust. Z 22633 Reference No.: Qty. (1) 4 (2) 12 (3) 4 (4) 3 * SW = Wrench size Re-tighten mounting bolts to their correct torque and replace missing or damaged bolts. 431 Bolt size mm Grade SW * mm Tightening torque Nm M30 10.9 46 1770 M20 10.9 30 510 M20 10.9 30 510 M16 10.9 24 265