MAINTENANCE 4.12 EVERY 1000 OPERATING HOURS OR EVERY 6 MONTH High-Strength Bolt Connections (continued) Check condition and fastening of main shut-off valve (2), compensator (4), and suction oil reservoir (7), illustration (Z 22634) Legend for illustration Z 22634 (A) Oil flow from main oil reservoir to suction oil reservoir (B) (1) Hand wheel of main shut-off valve (2) Main shut-off valve (3) Intermediate flange (4) Compensator (5) Connection pipe with inspection box (6) Inspection cover for suction strainer (8) (7) Suction oil reservoir (8) Suction strainer (9) Pump distributor gear, front (10) Mounting bolts, shut-off valve to intermediate flange (3) (11) Self locking nuts for compensator mounting.
IMPORTANT: Special torque 70 Nm (12) Mounting bolts, connection pipe (13) Mounting bolts, connection pipe to intermediate flange (14) Mounting bolts, intermediate flange to suction oil reservoir secured with self locking nuts (15) Mounting bolts suction oil reservoir Re-tighten loose mounting bolts and replace missing mount- ing bolts. Replace self locking nuts which have lost their clamping torque. If leakage is found on compensator (4), check the compensator according to Parts and Service News Bulletin No. AH01537, filed in volume 2 binder. * SW = Wrench size 441 Reference No.: Bolt size mm Grade SW * mm Tightening torque Nm Qty.
(10) M20 8.8 30 360 4 (11) Self locking nuts M20 30 70 24 (12) M20 10.9 30 510 2 (13) M20 10.9 30 510 12 (14) M20 8.8 30 360 18 (15) M20 10.9 30 510 8