Komatsu — 4.16.4 AFTER FINISHING THE WELD REPAIRS ON THE SUPERSTRUCTURE

MAINTENANCE 4.16 WELD REPAIRS Electrical Units in Cab Base, illustration Z22768 1. Switch off all circuit breakers on main switch board (3). 2. Disconnect all plugs on the programmable logic controller (4). 3. Remove the wiring harness connector (6) from electronic pump control module (5). 4. Switch off all circuit breakers on auxiliary switch boards for special equipment, e.g. preheating systems. REMARK Be sure to isolate Electronic Components of Special Equip- ment. Engine Electronics Disconnect the two Deutsch connectors (C5 and C6), illustra- tion Z 22516. The connectors are located on the LH engine side near.the flywheel housing.

Observe the instructions for weld repairs in the separate engine Operation and Maintenance Manual, filed in Volume 2 Binder. (1) - Engine harness (2) - Shovel harness 4.16.4 AFTER FINISHING THE WELD REPAIRS ON THE SUPERSTRUCTURE After finishing the weld repairs connect all cable connectors which have been disconnected. When connecting the two Deutsch con- nectors (C5 and C6), make sure you hear a click. When all electrical connections are established insert the battery main switch keys. 517