Komatsu — 3.2.5 EMERGENCY ESCAPE LADDER AT THE SUPERSTRUCTURE PLATFORM

OPERATION 3.2 CONSTRUCTION OF THE SHOVEL Legend for illust. Z22760 (1) Safety chains (2) Emergency escape ladder shown in storage position (3) Storage box for emergency escape ladder (2) (4) Ladder hooks (5) Cross bar on hand rail (7) (6) Emergency escape ladder shown in lowered position (7) Hand rail (8) Folding ladder inside the carbody (9) Hinged part of the ladder (10) Lock pin (11) Bracket for ladder (16) in folded up position Emergency escape ladder (6) In case of emergency with normal walkways obstructed use escape ladder (6) for leaving the machine. Proceed as follows: 6. Unhook safety chains (1). 7. Take out emergency escape ladder (2) from box (3). 8.

Separate ladder package (2) from hooks (4). 9. Fasten hooks (4) onto cross bar (5). 10. Remove clamp from ladder package (2) and lower the ladder to the ground, see position (6). Folding ladder inside the carbody (8) For folding down the ladder lift lower part (9) to disengage lock pins (10) from brackets (11) and swing down the lower part of the ladder as shown in the illustration. For folding the ladder swing up part (9) and engage pins (10) into the brackets (11). REMARK Before operating the shovel make sure the ladder (9) is securely locked in folded up position. 55