Komatsu — AFTER STARTING ENGINE

. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS switch on the monitor panel to select the 3 - 81 7. After the warming-up operation is completed, ch eck that each gauge and monitor la mp is in the followin g condi Engine oil level mo nitor (6): Is it lighted Charge level monit or (7): Is it lighted u Fuel level monitor (8): Is it lighted up? Engine coolant tem perature monitor (9 ): OFF Engine oil pressur Engine coolant tem Fuel gauge (12): Is e monitor (10): ON perature gauge (11) it in green range? Engine pre-heating Air cleaner cloggin Engine oil change Check for abnormal monitor (15):

OFF exhaust gas color, any problem is found , contact your Komatsu dist 9. Turn fuel control dial (2) to the full speed (MAX) position and carry out the operatio n is Step 5. for 3 to 5 minut 10. Repeat the following operation 3 - 5 times and o perate slowly. Boom operation RAISE ←→ LOWE Arm operation Bucket operation CURL ←→ DUMP Swing operation LEFT ←→ RIGHT Travel (Lo) operation FORWARD ←→ REVER REMARK f the a bove operation is not carried out, then may b e a delay in response when starting or stopping the actuation of the travel, swing, or wo rk equipment. 11. working mode to be u