. OPERATION MACHINE OPERATIONS AND CONTROLS BUCKET REPLACEMENT AND INVERSION WARNING while standing at the side for the work. Replacement 1. Place the bucket in contact with a flat surface. 2. Remove the double nut on the stopper bolt for arm pin (A) and link pin (B), remove the bolt, pull out arm pin (A) and link pin (B), and then remove the bucket. 3. Align the arm (5) with holes (1) of the replacement bucket and the link (6) with holes (2), then insert grease-coated pins (A) and (B) into hole (1) and hole (2) respectively.
3 - 103 When pins are knocked in with a hammer, pieces of metal may fly and cause seriou n, always wear goggles, hard hat, gloves, and other protective equipm When the bucket is removed, p If pins are hit with a strong force , there is a hazard that the pin may fly ou t and i njure p eople in the surrou nding area. Make sure unding area before starting the operation. When removing the pins, do not stand behind the bucket. In addition, be extremely ca reful not to put you r foot under the bucket When removing or inserting pin s, be extremely careful not to get your f ingers caugh Never insert your fingers into t Stop the machine on a firm an d flat surface and do the work.
When performing join t work, appo int a lead and follow that person's instructions and signals. REMARK When removing the pins, pla contact with the ground. ce the bucket so that it is in light If the bucket is lowered strong ly to the ground, the resistance will be increased and it will be diffi cult to remove the pins. NOTICE After removing the pins, make sure that mud or sand does not get on them. Dust seals are fitted at both ends o f the bushings, be careful not to damage them.