. MAINTENANCE MAINTENANCE PROCEDURE LUBRICATING 4 - 46 EVERY 100 HOURS MAINTENANCE Maintenance for every 50 hours se rvice shou ld be carri ed ou t at t he s NOTICE I f any a bnormal noise i s generated f rom a ny gre asing point , carry out g reasing regardless of the greas C arry o ut greasing eve ry 10 hours f or the first 5 0 hours on a new machine. A fter th e machine was subjected to jobs in the water, be su re to g rease the 1. Set t he machine to the greasi ng p osture shown on the right, lower the work equi pment to th e ground, t hen s top t he engine. 2. Using a grease pu mp, pump rease fitting s shown by ar 3.
After greasing, wip e off any old grease th at was pu shed (1) Boom cylinder rod p in (2 place (2) Arm c ylinder foot pi n (1 place) (3) Boom-Arm coupling pin (1 plac (4) Arm c ylinder rod en d (1 place) (5) Bucke t cylinder foot pin (1 plac (6) Boom cylinder foot pin (2 place