Komatsu — AFTER STARTING ENGINE

. MULTI-MONITOR SPECIFICATION MACHINE OPERATIONS AND CONTROLS (E): Left swing (F): Right swing 7 - 38 After starti ng the engine, do not immediately s tart operations. First, perform the followin g operations and checks. 1. Turn fu el control dial (2) to center p osition (a) betwee n the low idle (M a mid- temper IN) and high idle (MAX) positions an d run t he e ngine at range speed un der no loa d until the engine coolant . ature monitor giv es a green display 2. Set loc k lever (1) slowly and securely to the FREE position (F), then ra ise the bucket fr om the ground. 3.

Operat e bucket contro l lever (3) and ar m control lever (4) slowly of the to move the buck et cylinder and arm cylinder to the end stroke. 4. Operat e the bucket for 3 0 seconds and the arm for 30 seconds in turn (A): Ar (B): Ar (C): Bu (D): Bu fully for 5 minute s. ut m is pushed out m is pulled in cket is pushed o cket is pulled in REMARK I f the swin g lock switch (5) i s set to the ON (act uated) position and swing cont rol lever (4) is op erated at ful l stroke, oil temperaturerise can be inc reased earlier. NOTICE When the w ork equipment is re tracted, take care tha t it does not interfere with the machine body o