Doosan Infracore D18NAP — Assembly of Idle Gear

11. Cylinder block/head 1) Align the crankshaft pulley (A) to the pin and CAUTION attach it. Remove foreign substances such as residues and LOCTITE from the oil seal assembly bore. 2) Apply LOCTITE Blue 587 to the inside of the flange hex bolts (B). Do not reuse the oil seal; replace it with a new one. 3) Tighten flange hex bolts (B) at a tightening torque Be careful not to damage the oil seal when attaching it. of 26 kgf m. CAUTION 5) Remove the foreign substances on the timing gear case assembly surface and clean it with a dry cloth. 6) Apply LOCTITE 5902 to the timing gear case Be careful not to damage the oil seal.

Fix the crankshaft to allow the flange hex bolts to be tightened with the specified torque. assembly surface (F) with the diameter of ш 2.5 ± 0.5mm. 5. Attach the V-belt. CAUTION Keep clean liquid gasket dispensing surface. Dispensing line should not be snapped. 7) Align the timing gear case (A) with the pin and attach it. CAUTION Be careful that the timing gear case has been attached in the right direction. Assemble the timing gear case in 5 minutes after dispensing liquid gasket. Do not pressureize inside the timing gear case in 25 minutes after dispensing liquid gasket. 8) Tighten 16 hex bolts (B) at a tightening torque of 2.2kgf m. 9) Attach the crank speed sensor (C).

10) Tighten the fixing bolt (D). 4. Attach the crankshaft pulley. A B EDL013033A 11 - 41