. OPERATION OPERATION 3 - 140 CONSTRUCTING ROAD - METHOD OF MAKING V-DITCH The procedure shown i n the diagram s is for one side of the road. Repeat the same operation on of th e road. Whe n carrying out Step s 4 and 7, articulate the frame. 1. L ine of d itch: Light- duty digging Determine the lin e of the ditch along the measured points. : approx. 5 0 mm (2.0 in) l speed: ap prox. 2 km/h (1.2 MPH) 2. S econd digging pas s: Heavy-dut y digging 3. T hird digging pass: Heavy-duty d igging 4. F inishin g road shou