. MAINTENANCE SERVICE PROCEDURE Thickness of one shim : 0.2 mm (0.008 in), 0.5 mm (0.020 in) CHECK AND TIGHTEN WHEEL HUB NUT AND HUB BOLT distributor. 4 - 54 CHECK BALL JOINT CLEARANCE, ADJUST Check and adjust all locati ons with ball joints at the links of the work equipment. Check for any play in the b all joint, and if the axial play i s more than 1 mm (0.039 in), adjus Prepare a thickness gau . Remove all the shims . Tighten the caps with b olts (1) to make the sam e clearance the left and right. . Measure the clearance with a thickness gauge, then insert o mension, and tighten the cap. NOTICE Loose wheel hub nuts and hu b bolts (1) will result in shortened life of ti or other troubles.
. Carefully check for loo se bolts (1). When checking for loo the tightening direction Tightening torque: 610 (62. se borts (1), always turn the b orts (1 to check. to 765 Nm 5 to 78.0 kgm , 452.1 to 564.2 lbft) replace all the hub bolts. 564. . If a hub bolt is broken, replace all the hub bolts CHECKING WHEEL RIM, LOCK RING AND SIDE RING FOR CORROSION AND W If t he wheel rim, lock ring a nd side ring are heavily corroded, as k the t ire m anufacturer or yo ur Komatsu dis tributo for CHECK PARKING BRA KE 1 2 . Set the machine on a d ry downhill slope, set the gearshift le to the P (Parking) posit hold the machine in po . If any problem is fo ion, and check if the parking brake c sition.
und, please contact your Koma