STRUCTURE AND FUNCTION CLSS 3) When swing is operated independently When swing spool (12A) is operated, pump dis- charge amount Q flows to swing motor (23) and, at the same time, LS pressure P LS is gen- erated and unload valve (4) closes. LS pres- sure PLS becomes the load pressure of swing motor (23). In the swing circuit, the difference between pump discharge pressure Pp and LS pressure P LS (LS differential pressure P LS ) becomes the same pressure as the LS set pressure of LS valve (4). As a result, the swash plate of main pump (2) is kept at a position midway between the mini- mum and maximum swash plate angle and the main pump discharges the demand flow (approx.
50%) for the swing circuit. When the swing is operated independently pump discharge amount Q does not become 100%. 11. Stabilizer valve 11A. Spool 11B. Pressure compensation valve (EXTEND) 11C. Pressure compensation valve (RETRACT) 11D. LS shuttle valve 12. Swing valve 12A. Spool 12B. Pressure compensation valve (LEFT) 12C. Pressure compensation valve (RIGHT) 13. LS select valve 14. LS bypass plug 15. Main relief valve 16. Cooler bypass valve 17. Lift check valve Actuator 18. Bucket cylinder 19. Arm cylinder 20. Boom cylinder 21. Travel motor 22. Dozer cylinder 23. Swing motor 1. Hydraulic tank Hydraulic pump 2. Main pump 3. PC valve 4.
LS valve # The safety-suction valve, and suction valve are not shown. Control valve 5. LS bypass plug 6. Unload valve 7. Bucket valve 7A. Spool 7B. Pressure compensation valve (DUMP) 7C. Pressure compensation valve (CURL) 7D. LS shuttle valve 8. Arm valve 8A. Spool 8B. Pressure compensation valve (OUT) 8C. Pressure compensation valve (IN) 8D. LS shuttle valve 9. Boom valve 9A. Spool 9B. Pressure compensation valve (RAISE) 9C. Pressure compensation valve (LOWER) 9D. LS shuttle valve 9E. Check valve 10. Travel valve 10A. Spool 10B. Pressure compensation valve (FORWARD) 10C. Pressure compensation valve (REVERSE) 10D. LS shuttle valve 10-92