Komatsu — CLSS

STRUCTURE AND FUNCTION CLSS 4) When boom and arm are operated simultaneously If boom spool (A9) is operated to the RAISE po- sition and arm spool (8A) is operated to the OUT position, pump discharge amount Q flows to cylinders (20) and (19). When this happens, the load pressure of boom cylinder (20) is greater than the load pressure of arm cylinder (19), where the load pressure is lower. However, the pressure at the down- stream side of arm spool (8A) is compensated by pressure compensation valve (7B), which receives the load pressure (= max. LS pressure PLS) of the boom.

As a result, the upstream pressure and down- stream pressure of boom spool (9A) and arm spool (8A) become equal, so the oil flow from main pump (2) is divided in proportion to the area of opening of each spool. In the same way as when the boom is operated independently, the area of the opening of boom spool (9A) is a large oversize opening, so the difference between pump discharge pressure P P and LS pressure P LS (LS differential pres- sure PLS) becomes smaller. This LS differential pressure PLS is lower than the LS set pressure of LS valve (4), so main pump (2) is held at the maximum swash plate angle. 10. Travel valve 10A. Spool 10B. Pressure compensation valve (FORWARD) 10C.

Pressure compensation valve (REVERSE) 10D. LS shuttle valve 11. Stabilizer valve 11A. Spool 11B. Pressure compensation valve (EXTEND) 11C. Pressure compensation valve (RETRACT) 11D. LS shuttle valve 12. Swing valve 12A. Spool 12B. Pressure compensation valve (LEFT) 12C. Pressure compensation valve (RIGHT) 13. LS select valve 14. LS bypass plug 15. Main relief valve 16. Cooler bypass valve 17. Lift check valve Actuator 18. Bucket cylinder 19. Arm cylinder 20. Boom cylinder 21. Travel motor 22. Dozer cylinder 23. Swing motor 1. Hydraulic tank Hydraulic pump 2. Main pump 3. PC valve 4. LS valve # The safety-suction valve, and suction valve are not shown. Control valve 5. LS bypass plug 6.

Unload valve 7. Bucket valve 7A. Spool 7B. Pressure compensation valve (DUMP) 7C. Pressure compensation valve (CURL) 7D. LS shuttle valve 8. Arm valve 8A. Spool 8B. Pressure compensation valve (OUT) 8C. Pressure compensation valve (IN) 8D. LS shuttle valve 9. Boom valve 9A. Spool 9B. Pressure compensation valve (RAISE) 9C. Pressure compensation valve (LOWER) 9D. LS shuttle valve 9E. Check valve 10-94