Komatsu — EVERY 250 HOURS SERVICE

. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE Carry out the greasing operation every day when operating in places where the grease flows out easily after traveling through mud or water. the drive shaft runout of the 4 - 45 (5) Front suspensi on (left and right: 2 places each) Set the steerin g facing directly t o the fro nt befor e greasi (6) Steering linkag Portion "b" is fo r centralized greasing (5 places) LUBRICATE DRIVE SHAFT (5 PLACES 1. 2. 3. 4. 1. Using a greas e pump, pump i by the arrows. fittings marked 2. Add grease to the spider portio the cap seals 3. For the spline out from the v 4. After greasing , wipe off any old grease t hat wa s pushed out.

ease c omes ou CHECK DRIVE S I f there is any pr loosene connection, play i n the spline or be aring po rtion, o shaft, please cont act your Komatsu distribut or for r