I POTW R Rio IQ\I PRIMARY SHEAVE AND DRIVE V-BELT - ~ ----------------------------------------------------- 4EOO1 POWER TRAIN PRIMARY SHEAVE AND DRIVE V-BELT (J) Spider ® Collar ® Bushing @ Roller ® Primary sheave spring ®Shim (J) Primary sheave cap ® Bushing ® Fixed sheave @) Stopper ® V-belt @ Sliding sheave @ Collar @ Rivet @Weight @ Bushing @ Slider @ Bushing * 1. Tighten the bolt. 120 Nm (12 m· kg, 87 ft· Ib) 2. Loosen the bolt completely. 3. Retighten the bolt. 60 Nm (6.0 m· kg, 43 ft· Ib) A LEFT-HAND THREAD 4 Nm (0.4 m • kg, 2.9 ft Ib) 200 Nm (20 m· kg, 145 ft· Ib) 7 14 Nm (1.4 m • kg, 10 ft ·Ib) r---------, :~: I (2 I I I I I L _______ J 4-1 http://ReadManuals.com