. OPERATION TROUBLES AND ACTIONS TOWING THE MACHINE WARNING When the machine is stuck in soft ground and cannot escape 3 - 106 When t owing the machi ne, use a wire rope t hat has ample strength for the weight of the machine tha Do not apply a sudden l oad to the wire rope. under its own power, or when towing a he avy machine, pass the wire rop e through the f ront of the track f show in the diagram on the right bef ore carrying out to Places p ieces of wood between the wire prevent t he wire ropes f rom damaging the he bod SEVERE JOB CON DITION ater, if the water gets on to the work When digging in w ork equipment mounting pins, add grease ach operation.
to bucket links (A), (B), ng and deep digging (B), (C), (D ) and (E) for e When carrying out heavy duty diggi deep operations, add grea se to bucket links ( A), (B), (C), (D) and (E) (total: 5 places) befor e each operation. After greasing, oper e again. greas he links