. MAINTENANCE MAINTENANCE PROCEDURE Lubricating Work Equipment and maintenance (8) Blade foot pin (2 places) 4 - 46 NOTICE When breaking in a new machine , carry out lubrication e very 10 hours for the first 100 hours of opera I f any abnorm al sound comes from the greasing point, carry out greasing regardless of the inspe out digging work in water, always lubricate the pins that were under water. i nterval. A fter carrying out digging work i n water, always l ubricat e the pin s that P repare a gr 1. diagram, lo the engine. 2. Using a gre fittings show n by arrows. 3. After greasi ng, wipe off any old grease tha t was pushed out.
shown on the the hen (1) Bucket - Lin k connecting pin s (1 place) (2) Arm - Bucke t connection pin (1 place) ace) ace) (3) Arm - Link c oupling pin (1 pl (4) Bucket cylin der rod end (1 pl (5) Link couplin g pin (1 place) (6) Blade cylind er foot pin (1 pla (7) Blade cylind er rod end (1 pla (9) Boom swing bracket pin (2 p laces) (10 ) Boom swin g cylinder rod en d pin (1 place (11 (12 ) Boom foot ) Boom cylin pin (1 place) der foot pin (1 pl ace)