Komatsu — IN COLD AREAS (AUTOMATIC WARMING-UP OPERATION)

OPERATION OPERATION 4. Lower the control lever pad (4) to the FREE position, put PPC lock switch (7) to on position and raise the bucket from the ground. 5. Operate boom and bucket control lever (5) and arm control lever (6) slowly to operate the boom cylinder, bucket cylinder, and arm cylinder to the end of their stroke. 6. Operate the boom and arm slowly at the same time, and repeat this for 30 seconds. Next, repeat the same operation with the bucket and swing for 30 seconds. Operate both fully in turn for 5 minutes. NOTICE When pulling in the work equipment, be careful not to let it hit the chassis or ground. 7.

Turn fuel control dial (1) to the full speed (MAX) position and carry out the operation is Step 6 for 3 -5 minutes. 8. Repeat the following operation 3 - 5 times and operate slowly. G Boom operation RAISE LOWER G Arm operation IN OUT G Bucket operation CURL DUMP AN113990A G Swing operation LEFT RIGHT G Travel (Lo) operation FORWARD REVERSE 119 A Left swing B Right swing