1 page 1 Models J08C-TP and J08C-TR ENGINE 3-19-5 20. CONNECT THE SPEEDOMETER CABLE TO THE TRANSMISSION. 21. CONNECT THE PARKING BRAKE CABLE (1). 1. Connect the cable wiring to the frame. 2. Insert the parking brake cable from the back of the cab and install the bracket. NOTE: Be sure to insert the cable straight and slowly. Excessive force during insertion may crack the gasket as shown in the figure. A cracked cable must be replaced with a new one. 22. CONNECT THE POWER STEERING LINE TO THE GEAR UNIT. 23. FILL THE COOLANT RESERVOIR. Add coolant slowly until the system is filled up to the filler opening, then install the cap securely. Coolant capacity:
21 L (22.19 US qt) 23 L (24.30 US qt) (with transmission oil cooler only) NOTE: Trapped air in the cooling system can cause over- heating. 24. RELEASE OVERTILTING OF THE CAB. NOTE: Refer to CAB in CHAPTER 19. Fig. 22 SM3-J590 SM3-J Fig. 18 SM3-J589 F ig. 19 SM3-J58 7 Fig. 20 OPEN CLOSE DRAINING PLUG SM3-J586 Fig. 21 OVER-TILTING N POSITION ORMAL POSITION SM3-J585