Komatsu — PRE LIFTING PROCEDURES

OPERATION USING WIRE ROPE When lifting the machine, if the wire rope is not installed correctly on the machine, the machine may fall and cause serous injury or even death. Raise the machine 100 to 200 mm (3.9 to 7.9 in) from the ground, check to be sure the machine is horizontal, level and that there is no slack in the wire rope, then continue to lift the machine. Before lifting the machine, always stop the engine and lock the brakes. Lock front frame and rear frame with safety bar. Lifting operations using a crane must be carried out by a qualified operator. Never raise the machine with any personnel on it.

Always make sure that the wire rope used for lifting the machine is of ample strength for the weight of the machine. When carrying out the lifting operation, please contact your Komatsu distributor. The lifting procedure applies to machines with standard specifications.The method of lifting differs according to the attachments and options actually installed. In such cases, contact your Komatsu distributor for information. For details of the weight. See “WEIGHT TABLE” on page (2-79) Never use a wire rope which has cut strands (A), reduced diameter (B), or kinks (C). There is danger that the rope may break during the lifting process. PRE LIFTING PROCEDURES 1.

Start the engine and raise the work equipment to the travel height and roll the bucket back. Be sure the bucket is empty. WA480-5L 2-115