Komatsu — Komatsu PC290NLC-6K and PC290LC-6K Hydraulic Excavator Operation & Maintenance Manual

24. SERVICE PROCEDURE BLEEDING THE FUEL SYSTEM Controlled venting is provided at the injection pump through the fuel drain manifold. Small amounts of air introduced by changing the filters or injec- tion pump supply line will be vented automatically, if the fuel filter is changed in accordance with the instructions. However, manual bleeding will be required if : The fuel filter is not filled prior to installation. Injection pump is replaced. High pressure fuel lines are replaced. VENTING THE LOW PRESSURE LINES AND FUEL FILTER 1. Open the bleed screw. (wrench size: 10 mm.) 2. Operate the hand lever until the fuel flowing from the fitting is free of air. Tighten the bleed screw to 9 N.m.

(7 ft-Ibs). 3. Air/fuel can be pumped from this location with the hand lever on the lift pump if the fuel solenoid valve is energised. 4. Air can be vented from both pumps through the fuel drain manifold line by operating the starting motor. When using the starting motor to vent the system, do not engage it for more than 30 seconds at a time: wait two (2) minutes between engagements. VENTING THE HIGH PRESSURE LINES Loosen the fittings at the injectors, and crank the engine to allow en- trapped air to bleed from the lines. Tighten the fittings to 30 N.m. (22 ft.- lbs) (wrench size: 17 mm.) CAUTION: High pressure could cause penetration of the skin.

PC290-ENG 3-60 WARNING It is necessary to put the engine in the “RUN” position. Be- cause the engine may start, be sure to follow all the safety precautions. Use the normal starting procedure. WARNING WARNING Do not bleed a hot engine as this could cause fuel to spill onto a hot exhaust manifold creating a danger of fire. Start the engine and vent one line at a time until the engine runs smoothly.