Komatsu — Komatsu PC290NLC-6K and PC290LC-6K Hydraulic Excavator Operation & Maintenance Manual

28. MACHINES READY FOR ATTACHMENTS 28.3. ATTACHMENT MOUNTING / DISMOUNTING PROCEDURE DISMOUNTING PROCEDURE 1. Curl the arm in then lower the boom to the ground. Set the attachment valves on the arm to the stop position as shown. 2. Place the attachment on the ground and stop the engine. 3. Operate levers and attachment pedals to full stroke 2 to 3 times to release hydraulic system pressure. Ensure oil temperature is low. 4. Remove the hoses on the attachment side. Install the blind plugs to the two outlets a . Install blind plugs to the attachment hoses to prevent entry of dirt during dismounting and storage. 5. Dismount the attachment by removing the retaining pins (2 pins).

Then, mount the bucket. For the bucket mounting procedure, see 12.15 “REPLACEMENT AND INVERSION OF BUCKET’’. 6. After the bucket is mounted, check the hydraulic oil level. PC29-ENG 5-9