Komatsu — Komatsu PC290NLC-6K and PC290LC-6K Hydraulic Excavator Operation & Maintenance Manual

28. MACHINES READY FOR ATTACHMENTS WHEN USING GENERAL ATTACHMENT SUCH AS CRUSHER When the pedal is depressed at the front or rear portions, the attach- ment is actuated. Precautions when using Check that the stop valve is at the FLOW position. Confirm that the selector valve is set to the position for general at- tachments such as the crusher. For details of the oil path, see 28.2 “HYDRAULIC CIRCUIT’’. For other precautions when using the attachment, see the instruction manual provided by the attachment manufacturer. 28.5 LONG TERM STORAGE If the equipment is not to be used for a long period, do as follows. Set the stop valve to the STOP position.

Install the blind plugs and O-rings to the arm and tubes. If the pedal is operated when there is no breaker or general attach- ment installed, it will cause overheating and other problems. a 28.6 SPECIFICATIONS Hydraulic specifications Max. flow when flow is joined: 197 x 2 litre/min (52 x 2 US gal/min. 43 x 2 UK gal/min) Safety valve relief set pressure of service valve: 27500 kPa (280 kg/cm 2 , 3980 psi) Safety valve cracking set pressure of service valve: 24500 kPa (250 kg/cm 2 , 3550 psi) Left hand boom piping flow and right hand flow can have different pressures. Consult your dealer for various pressures available. PC29-ENG 5-12